#The dependency map

The roadmap is ordered on purpose. Payments, identity and security come before provider integrations and real yield. Aero L1 is downstream and separate.

DiagramMermaid
flowchart TD
  M0["M0 · Product boundaries<br/>threat model · release gates<br/>PASSED"]
  M1["M1 · Identity and wallets<br/>M1A design · M1B source<br/>CONDITIONAL PASS"]
  M2["M2 · Payments, ledger<br/>reconciliation<br/>NEXT"]
  M3["M3 · Security and operations<br/>CI · monitoring · secrets"]
  M4["M4 · Yield contract and<br/>deployment acceptance"]
  M5["M5 · Real payment and<br/>biller features"]
  M6["M6 · Support and<br/>communications"]
  L1["Aero L1 / ICM<br/>separate workstream"]

  M0 --> M1
  M1 --> M2
  M1 --> M3
  M2 --> M3
  M0 --> M4
  M3 --> M4
  M2 --> M5
  M3 --> M5
  M1 --> M6
  M3 --> M6
  M3 --> L1
  L1 -.->|must not block| Consumer["Fuji consumer sandbox"]

  classDef passed fill:#effaf5,stroke:#9fd3bd,color:#087a55
  classDef active fill:#f2f0ff,stroke:#bdb2f4,color:#3d21b0
  classDef planned fill:#f7f6fb,stroke:#d8d5e5,color:#5e5a76
  classDef separate fill:#fff8ec,stroke:#e8d0a9,color:#8a5600
  class M0 passed
  class M1 active
  class M2,M3,M4,M5,M6 planned
  class L1 separate

#Current milestone status

Milestone Status What exists
M0 Implemented Tested Product boundaries, threat model, release gates, decisions register. Beta/production intentionally blocked.
M1A Implemented Identity, wallet, recovery and session architecture. Documentation only.
M1B Implemented Partial Fuji EOA SIWE, linked wallets, sessions, rate limits, audit, runtime role, UI panel. Conditional pass.
M1C Planned Field-level retention/deletion, browser two-wallet E2E, Neon role provisioning, controlled enrollment decision.
M2 Planned Durable payment intent/state, ledger, idempotency, indexer and reconciliation.
M3 Planned Managed staff identity, CI, monitoring, alerting, secret management, incident and backup drills.
M4 Partial Router source and adversarial tests exist. B2.2 simulation ready for approval; no broadcast, no live market, no audit.
M5 Planned Real payment request/receipt and biller/provider adapter.
M6 Planned Support tickets, communications and account operations.
Aero L1 Design Blocked Separate workstream. No verified chain identity, validator set, native token or consumer ICM flow.

#Where the last milestone ended

#M1B — conditional pass

M1B implemented and tested the server-side identity foundation. The closure was CONDITIONAL PASS, not a full pass. Open items:

  • browser two-wallet E2E with real providers and funded Fuji EOAs;
  • Neon/production role provisioning and migration;
  • production-representative pool/limiter load testing;
  • retention decision D-12;
  • explicit enrollment policy.

Account creation remains closed. No user was created in Neon.

#B2.2 — ready for approval, not deployed

The B2.2 report simulated a fresh nine-transaction router stack:

  • two mock markets;
  • two adapters;
  • one router with 60/40 targets;
  • two adapter bindings;
  • AeroPay;
  • AeroBank.

No transaction was broadcast. Predicted addresses are untrusted. The trusted manifest is empty. The verdict is READY FOR EXPLICIT BROADCAST APPROVAL, subject to a separate authorization.

#What comes next

#1. M1C — close identity operations

  • Resolve D-12 with field-level retention and deletion rules.
  • Run the browser two-wallet E2E.
  • Provision Neon roles and apply migrations with an approved maintenance window.
  • Decide whether a controlled Fuji enrollment is justified.
  • Keep signup closed until that decision.

#2. M2 — build the financial record

  • Payment intent and immutable transaction state machine.
  • Idempotency keys and (chainId, txHash, logIndex) uniqueness.
  • Reorg-aware indexer and reconciliation job.
  • Confirmation/finality policy.
  • Allowance/revoke UX and token allowlist.
  • Support for failed, replaced, reverted and reorged transactions.

#3. M3 — make operations real

  • Managed staff identity and role-based authorization.
  • CI for lint, typecheck, build, migrations, contract tests and browser tests.
  • Structured redacted logs, metrics, alerting and incident runbook.
  • Secret manager, rotation and canonical-origin policy.
  • Backup/restore and rollback drills.

#4. M4 — accept yield only after review

  • Freeze source and build inputs.
  • Run the full Foundry and adversarial/property suites from a clean environment.
  • Resolve the remaining adapter withdrawal share-delta question.
  • Test against a pinned live-market fork.
  • Decide the withdrawal liquidity model (queue, reserve or reviewed all-or-nothing).
  • Add pause/emergency controls, timelock/multisig ownership and monitoring.
  • Produce a signed deployment manifest and independent runtime verification.

#5. M5–M6 — provider features and support

Only after M1–M3:

  • biller/provider adapter with authenticated responses, quotes, reversals and idempotency;
  • real payment request/receipt screens over the durable record;
  • fiat on-ramp only through an approved provider with KYC/AML and jurisdictional controls;
  • support ticket, message, assignment and audit model;
  • notification preferences and delivery status.

#What is deliberately not next

  • A new consumer surface before the ledger.
  • Live Benqi/Joe yield before audit and liquidity acceptance.
  • A production token or chain before an approved manifest.
  • Aero L1/ICM as a consumer feature.
  • Real-money biller/card flows before legal, provider and support readiness.
  • A marketing claim that outruns the release gate.

#Decision gates

The decisions register records unresolved decisions D-05 through D-20, including production chain, assets, finality, yield risk, withdrawal expectations, billers, retention, support access and deployment ownership. A milestone cannot close by declaring a decision resolved in code alone.

See Current status for the evidence matrix and Security for the open risks.